Cost & Planning Guide

General contractor costs in Florida — what owners ask online

Short answer: the cost threads all circle the same frustration — nobody will give a straight number. That is because the honest number comes from scope, site and selections, not from a per-square-foot guess made over the phone. Here is how to build a budget you can actually hold.

The five drivers (Florida edition)

  1. Scope changes. Signed change orders with prices protect both sides; open-ended "while you're at it" work is where budgets die.
  2. Structural findings. Florida slabs, high water tables and storm-era construction surface surprises once walls open — a contingency line is planning, not padding.
  3. Selections. Finishes swing budgets more than labor does. Allowances listed in dollars make bids real.
  4. Permitting cycles. City review and inspection gates the schedule; schedule risk is cost risk.
  5. Insurance-driven work. Storm-repair scope must match what the adjuster's scope paid for — supplements change the math.

Building the budget

Three bids, identical written scopes with dollar allowances, a contingency you actually hold, and a contractor who explains change orders before you sign. That combination survives contact with a real renovation.

FAQ

Why won't GCs give a number over the phone?

Because the honest number depends on scope and site. A phone number is a sales tactic, not an estimate.

How much contingency should I hold?

Enough to absorb one structural surprise and one selection upgrade — your GC should help you size it from the scope, not from a percentage rule alone.